After a long battle with water tables today which required additional amount of material to be used to complete the main drain repair the specialists were unable to finish the repair today. The main drain has been re-plumbed and started to reseal into the shell of the pool but the specialists ran out of material before completion. This will require and extra appointment on Friday to complete the repair.